Der eiserne Film 1917

Synopsis

Title: The iron film. Pictures from Germany's war wrought. Military official film of the image and film Office BUFA II. part of blast furnace.

1 subtitles: High up on the highest platform of the furnace you have wide views of the gout, the city, the works and their environment.
Image: blast furnace facilities.
2. subheads: ore 18 cars and 24 car of coke appears alternately in the "bowl" of the blast furnace. The ground is "begichtet".
Image: Feeding of blast furnace.
3. subtitles: Toxic gas escaping from the gout is lit.
Image: Flaring of the escaping gases.
4. subheads: The cast iron in the blast furnace molten is at the bottom of the oven "tapped."
Image: blast furnace tapping.
5. subheads: The liquid cast iron out through a trough of sand in a pan.
Image: Cast iron goes into the pan.
6. the empty cast iron pan is now retracted into the cast iron tunnel.
Image: A work train the empty pan to the right place.
7. Subtitles: The cast iron, pierced by the furnace is in the pan.
Image: Cast iron, running up in the pan.
8 subtitles: 6-7 times a day 400-500 quintals will be stabbed.
Image: The cast iron in the cast iron pan is filled under heavy rain of sparks.
9 subtitles: The cast iron pan is filled to the pig iron mixers of the steelworks.
Image: Ride the factory car to the steel mill.
10 subtitles: Part BUFA closing seal the end of the II title: the iron film. Pictures from Germany's war wrought. Military official film of the image and film Office BUFA III. part: steel mill 1 subtitles: the pan with the liquid cast iron comes in the steelworks in the pig iron mixers, including 5000 Zentner.
Image: Cast iron is filled from pans in the pig iron mixers.
2. subheads: Daily reach 40-42 pans to the mixer.
Image: The discharge goes on.
3. subtitles: The pan to the mixer is lifted by Krahns.
Image: The Pan has been lifted by the crane.
4. Subtitles: The mixer is tipped and emptied 400-440 quintals cast iron while under heavy rain of sparks every time.
Image: Emptying the mixer under heavy rain of sparks.
5. subheads: The cold pig iron transactions on particular routes to steel mill is loaded from Magnetkrahn.
Image: Loading of cast iron by means of magnetic crane.
6 subheads: The cargo is transported by means of elevator to gout of a furnace (Cupolofen) and is fused to the cast iron mixer.
Image: Assembly of the furnace.
7 subtitles: Women working at the Cupol furnace maintenance.
Image: women's work in a steel mill.
8 subtitles: The pan with cast iron is the mixer in a steel mill.
Image: factory car takes the Pan beneath the crane, which picks up the pan.
9. the Krahn is the pan to the converter.
Pig iron used in the converter.
10 subtitles: The pear-shaped converter weighs empty about 1200 Zentner with lining.
Image: The Pan remains before the converter in limbo.
11. Subtitles: The converter stage has risen, and the Pan reaches the mouth of the converter.
Image: Both parts of the bridge of workers were raised so that the pan to the opening of the converter can be reached;
12 subheads: Poured the contents of the pan into the converter.
Image: The Pan is attached to the converter, the pig iron is poured into the converter.
13 subtitles: The converter is.
Image: extraction of steel in the converter;
14 subtitles: Under strong rain of Sparks, air is blown through the converter.
Image: Strong sparks from the converter.
15 subheads: This the pig iron is converted by combustion of carbon, phosphorus, and Silicon in steel.
Image: Combustion of carbon, phosphorus and Silicon in the converter under heavy rain of sparks.
16 subtitles: To the progressive bezw. to determine finished removal of phosphorus, a sample of steel is taken from the charge converter. Image: Flip liquid hot steel into a mould.
17 subtitles: By the addition of lime, resulting slag is deducted, after cool Very much finely ground and used as fertilizer (Phospate).
Image: Extraction of Phospate from slag.
18 subtitles: The casting car is driven under the converter, which emptied the finished steel in the ladle.
Image: Emptying of the converter in the ladle.
19 subtitles: The casting car driving into the casting Hall to the mould (block form.)
Image: After filling the casting car it is in motion.
20 subheads: The shells are used to pour the block form suitable for Auswahlzung.
Image: The casting car rolls to the shells.
21 subtitles: The shells are filled with steel.
Image: Fill the molds.
22 subtitles: The casting car driving after the cast back to the converter Hall.
Image: The last mould is filled with steel, the casting car is back in motion.
23. Subtitles: Cast steel block frozen in a such gravity that is accessible with Stripperkrahn, still glowing on the trolleys used and departed.
Image: A glowing steel block used by a Krahn on a work train car.
24 intertitles: Daily go about 225 blocks in the image mill: transport of steel blocks to the rolling mill.
26 subtitles: Part BUFA closing seal the end of the III title: the iron film. Pictures from Germany's war wrought. Military official film of the image and film Office BUFA IV. part schentitel mill 1: the new crude steel blocks coming of the steel mill to achieve a uniform temperature about 1 hour in deep pits used.
Image: A crane sunk the steel blocks in the ground and get another block;
2. the block of raw steel arrives on the block Street - image: the steel block is lifted on the block road.
3. Subtitles: and is rolled down on the block road to the cross-section growing need for the Fertigstraßen.
Image: Editing the raw steel bracket in the blooming mill.
4. subheads: What the Blockscheere cuts the ingots to the lengths required for the different profiles.
Image. The steel blocks are cut to size.
5. subtitles: The iron stick for the wire rolling mill pilot rolled are forwarded by women.
Image: Women carrying iron stick in the wire mill.
6 subheads: Cut access to the repeated heating in a furnace - image: the iron billets will be ramped up to an annealing furnace.
7 subtitles: and be rolled out after leaving, to Rails, or beams.
Image: Heat oven door closes.
8. Subtitles: The river iron stick in the cast pusher-type furnace on rolling heat heated, undergoes two arranged before rolling mills, - image: the long river iron rolled shuts on the scaffold, is withdrawn, again, ascended to the framework;
9 subtitles: both are equipped with automatically working to guided tours.
Image: The iron stick will be rebooked.
10 subtitles: then also automatically in the underlying line of finish, consisting of 10 rolling mills, convicted to be.
Image: iron sticks come to a machine and rolled into thin sheets.
11 subtitles: The last pair of rollers gives the case a final section (5 mm: 350 meters long.).
Image: Manufacture of wire in the wire mill.
12 subtitles: The finished wire is reeled up automatically to a ring - image: machines automatically rotate the wire to roles.
13. Subtitles: and this form via a mobile cooling bed promoted to the bind database and continue in the wagons.
Image: wire roll float on the portable cooling beds.
14 subtitles: Daily power: 240 000 kilograms.
Image: Removal of the wire coils.
15 intertitles: End of the IV part.
BUFA-closing seal.

Title: The iron film. Pictures from Germany's war wrought. Military official film of the image - and Fund Office BUFA V. part storage and loading.

1 subtitles: Great Krähne for 5000 kg payload and 30 meters from span coat the whole camp.
Image: Part of the Verladebrücke can be seen. Workers walk around on steel girders.
2. subheads: The Krähne mobile are so-called gantries and lengthwise of the storage bins.
Image: Use of gantries;
3. subtitles: On the Krähnen trolley (trolley) - image are: to see is how the carriage takes a series of steel beams.
4. Subtitles: which is movable in the transverse direction of the Krahns.
Image: The crane with the carriage settles down on a provided freight train.
5. subtitles: The carriages get the lifting and lowering the load.
Image: The crane skating in the longitudinal direction of the train.
6 subtitles: The Krahnführer controls the Krähne by means of special electric motors for each Krahnbewegung in his cab.
Image: The crane stops on a flat car.
7 subtitles: Every Krahn can process 500-660 tonnes per day.
Image: The carriage will drain the steel girders of a car.
8 subtitles: air-raid warning!
Image: air-raid warning;
Workers entering a bunker of the Earth.
9 subtitles: End of the part.
BUFA-closing seal.

Title: The iron film. Pictures from Germany's war wrought. Military official film of the image and film Office BUFA VI. part production of grenades.

1 subtitles: women's work in the core.
Photo: Women at work in the core.
2. Subtitles: Forming the core.
Image: The worker is from the form and fills them with moulding sand.
3. subtitles: The reconstruction of the moulds for the casting of Garnet.
Image: The worker is the form for the Garnet cast.
4. subheads: 7 grenades are shaped in a block.
Image: Both women and children working on the forms.
5. subtitles: The steel required for the casting of the shells is stabbed in the EAF furnace.
Image: Hot steel flows into a form.
6 subtitles: The steel is poured into the forms of Garnet.
Image: Casting of the pomegranate arils.
7 subtitles: The moulding sand is cut off after the solidification of the "blanks".
Image: Workers and children cut off the molding sand of the forms.
8 subtitles: The "lost head" is turned off and cut off.
Image: Workers shows the "lost head".
9 subtitles: The Hall of the Garnet Turnery.
Image: Workers and workers in the Garnet Turnery.
10. Subtitles: The grenades are "scrubbed."
Image: The outermost layer of the shell is milled off while a worker continually measures the correct width of the grenade.
11 subtitles: The head of the grenades will be abgreht.
Picture: It shows how the head of the grenade "blunt".
12 subtitles: The grenade will be upgraded.
Image: A hole is drilled at the top of the grenade.
13 subtitles: The "Stemmnuten" are milled.
Image: A worker spans the grenades in a machine, where the "Stemmnuten" are milled (not seeing).
14 subtitles: The Guide bead will be "settled."
Image: A worker files along the outer shell of the grenade.
15 subtitles: The copper band management channel is "grained."
Image: A worker has holes for a copper band with punch and hammer.
16 subtitles: The bottom of the shells is "tapped."
Image: a hole is drilled In the rear of the grenade.
17 subtitles: The copper guide ring is pressed. Image: The copper guide ring is a stamped in the grenade.
18 subtitles: Copper guide ring is shut off.
Image: Editing of the Garnet shell with guide ring.
19 subtitles: The shells are loaded.
Image: Loading the grenades.
20 subheads: grenade workers with the war merit cross.
Image: Three workers, who proudly wear the war merit cross.
21 subtitles: war summer evening 1917 image: the railheads in the evening light.
22 subtitles: At the end of the VI part.
BUFA-closing seal.

Topics

German Reich (forge of war, 1917); Blast furnace (German Reich, 1917); Coke (German Reich, 1917); Forge of war (German Reich, 1917); Steel mill (German Reich, 1917); Walzwerk (Roman Empire, 1917); 1914-1918 (total period; first world war); First world war

Type

Documentary

Genre

Industrial Film (S)

Translated by Microsoft Translator

Title:

Der eiserne Film

Bilder aus Deutschlands Kriegsschmiede (Additional title)

Country of Origin:
German Reich

Year of Production and/or Release

Year of Production:
1917

Credits

Technical Data

Save all sequences:
Delete all:

Have you seen these gems?

  • UFA-Wochenschau 486/1965
    16.11.1965

  • Welt im Film 300/1951
    02.03.1951

  • UFA-Wochenschau 3/1956
    15.08.1956

  • Welt im Film 301/1951
    09.03.1951

  • UFA-Dabei 632/1968
    03.09.1968

  • Welt im Film 97/1947
    04.04.1947

  • Neue Deutsche Wochenschau 619/1961
    08.12.1961

  • Welt im Film 222/1949
    29.08.1949

  • Messter-Woche 1915
    1915

  • Deulig-Woche 30 (seit 1929)
    01.07.1929

We use cookies on our site to improve your experience. Their use improves our site’s functionality.
For more detailed information please read our Privacy Notice.
OK